Small Commercial Projects in Essex: Planning, Building Regulations and CDM Explained

Writer: Stephen Owen
Stephen Owen
Apr 23
2 min read

Updated: Oct 31

Extending a nursery, refitting a café or converting a unit for a new use involves more rules than a home extension, and the stakes are higher because your business depends on the result. This guide covers the three areas that matter most: planning, Building Regulations and health and safety law.

Planning: start with the use class

Every building has a planning "use class". Since September 2020, Class E covers a wide range of commercial uses, including shops, cafés and restaurants, offices, gyms, clinics, and nurseries and day centres. Changing between two Class E uses often doesn't need planning permission. Some uses sit outside Class E, including pubs and hot food takeaways, so changing to or from them normally does.

Before relying on Class E, check for:

  • planning conditions on the building that restrict its use or opening hours;

  • a Section 106 agreement tied to the site;

  • an Article 4 Direction removing those rights in your area;

  • restrictions in your lease or the property's title.

Physical changes are separate. Extensions, new shopfronts and most external alterations need planning permission, and signs often need advertisement consent.

Parking and highways often decide the outcome

For businesses with visitors, drop-offs or deliveries, the council's highways team often has as much influence as the planning officer. On our Scallywags Nursery project in Hornchurch, the first application was refused over parking and traffic. We redesigned the scheme to deal with those concerns head-on, and it was approved at planning committee. If your project will increase visitor numbers, plan for parking and drop-off from day one.

Building Regulations for commercial buildings

Commercial buildings follow their own guidance on the key areas:

  • Fire safety: escape routes, fire separation and alarm systems are assessed against Approved Document B, Volume 2.

  • Access: entrances, toilets and circulation need to be usable by disabled people, following Approved Document M, Volume 2.

  • Energy and ventilation: insulation, glazing and ventilation must meet current standards.

Once the building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person, usually the owner or employer, to carry out a fire risk assessment and keep it up to date.

CDM 2015: your duties as a commercial client

The Construction (Design and Management) Regulations 2015 apply to all building work. As a commercial client, you have legal duties to make sure the project is managed safely, including allowing enough time and resources. If more than one contractor will work on the project, you must appoint a Principal Designer and a Principal Contractor in writing. Larger projects, lasting more than 30 working days with more than 20 workers on site at the same time, or more than 500 person-days in total, must also be notified to the HSE.

We are qualified to act as your Principal Designer, so the design and the health and safety planning are handled by the same team.

Our commercial work

Alongside homes, we have designed a nursery expansion in Hornchurch, a pub refurbishment in South London and a sports club extension in Bedfordshire. Each involved balancing what the business needed with what the council would approve.